OMNeT++/OMNEST Bug Tracker - OMNeT++ | |||||
View Issue Details | |||||
ID | Project | Category | View Status | Date Submitted | Last Update |
0000240 | OMNeT++ | IDE / sequence chart | public | 2011-01-21 14:27 | 2011-01-31 18:23 |
Reporter | jeromerousselot | ||||
Assigned To | levy | ||||
Priority | normal | Severity | minor | Reproducibility | always |
Status | resolved | Resolution | fixed | ||
Platform | OS | OS Version | |||
Product Version | 4.1 | ||||
Target Version | Fixed in Version | 4.2b1 | |||
Summary | 0000240: Go To simulation time feature only allow absolute time values | ||||
Description | When inspecting a sequence chart / eventlog, it is useful to go back and forth between some points in the log, which can be separated by a huge number of events (hundred or thousand of events). Scrolling by hand is inconvenient, and the "Go to simulation time" dialog box is very helpful in that case. It would be even better if it were possible to enter values such as: (1) simple computations, for instance 1.3+0.2 or 1.3-0.5 (2) time shift relatives to the current point / current view: T0 - 0.2 s, instead of absolute values. | ||||
Steps To Reproduce | |||||
Additional Information | |||||
Tags | No tags attached. | ||||
Relationships | |||||
Attached Files | |||||
Issue History | |||||
Date Modified | Username | Field | Change | ||
2011-01-21 14:27 | jeromerousselot | New Issue | |||
2011-01-26 15:51 | andras | Assigned To | => levy | ||
2011-01-31 17:35 | levy | Note Added: 0000376 | |||
2011-01-31 17:35 | levy | Status | new => resolved | ||
2011-01-31 17:35 | levy | Fixed in Version | => 4.2b1 | ||
2011-01-31 17:35 | levy | Resolution | open => fixed | ||
2011-01-31 18:23 | andras | Note Added: 0000377 |
Notes | |||||
|
|||||
|
|
||||
|
|||||
|
|